Safe Haskell | None |
---|---|
Language | Haskell2010 |
Manipulate the time periods typically used for reports with Period, a richer abstraction than DateSpan. See also Types and Dates.
Synopsis
- periodAsDateSpan :: Period -> DateSpan
- dateSpanAsPeriod :: DateSpan -> Period
- simplifyPeriod :: Period -> Period
- isLastDayOfMonth :: (Eq a1, Eq a2, Num a1, Num a2) => Integer -> a1 -> a2 -> Bool
- isStandardPeriod :: Period -> Bool
- showPeriod :: Period -> String
- showPeriodMonthAbbrev :: Period -> String
- periodStart :: Period -> Maybe Day
- periodEnd :: Period -> Maybe Day
- periodNext :: Period -> Period
- periodPrevious :: Period -> Period
- periodNextIn :: DateSpan -> Period -> Period
- periodPreviousIn :: DateSpan -> Period -> Period
- periodMoveTo :: Day -> Period -> Period
- periodGrow :: Period -> Period
- periodShrink :: Day -> Period -> Period
- mondayBefore :: Day -> Day
- yearMonthContainingWeekStarting :: Day -> (Integer, Int)
- quarterContainingMonth :: Integral a => a -> a
- firstMonthOfQuarter :: Num a => a -> a
- startOfFirstWeekInMonth :: Integer -> Int -> Day
Documentation
periodAsDateSpan :: Period -> DateSpan Source #
Convert Periods to DateSpans.
>>>
periodAsDateSpan (MonthPeriod 2000 1) == DateSpan (Just $ fromGregorian 2000 1 1) (Just $ fromGregorian 2000 2 1)
True
dateSpanAsPeriod :: DateSpan -> Period Source #
Convert DateSpans to Periods.
>>>
dateSpanAsPeriod $ DateSpan (Just $ fromGregorian 2000 1 1) (Just $ fromGregorian 2000 2 1)
MonthPeriod 2000 1
simplifyPeriod :: Period -> Period Source #
Convert PeriodBetweens to a more abstract period where possible.
>>>
simplifyPeriod $ PeriodBetween (fromGregorian 1 1 1) (fromGregorian 2 1 1)
YearPeriod 1>>>
simplifyPeriod $ PeriodBetween (fromGregorian 2000 10 1) (fromGregorian 2001 1 1)
QuarterPeriod 2000 4>>>
simplifyPeriod $ PeriodBetween (fromGregorian 2000 2 1) (fromGregorian 2000 3 1)
MonthPeriod 2000 2>>>
simplifyPeriod $ PeriodBetween (fromGregorian 2016 7 25) (fromGregorian 2016 8 1)
WeekPeriod 2016-07-25>>>
simplifyPeriod $ PeriodBetween (fromGregorian 2000 1 1) (fromGregorian 2000 1 2)
DayPeriod 2000-01-01>>>
simplifyPeriod $ PeriodBetween (fromGregorian 2000 2 28) (fromGregorian 2000 3 1)
PeriodBetween 2000-02-28 2000-03-01>>>
simplifyPeriod $ PeriodBetween (fromGregorian 2000 2 29) (fromGregorian 2000 3 1)
DayPeriod 2000-02-29>>>
simplifyPeriod $ PeriodBetween (fromGregorian 2000 12 31) (fromGregorian 2001 1 1)
DayPeriod 2000-12-31
isStandardPeriod :: Period -> Bool Source #
Is this period a "standard" period, referencing a particular day, week, month, quarter, or year ? Periods of other durations, or infinite duration, or not starting on a standard period boundary, are not.
showPeriod :: Period -> String Source #
Render a period as a compact display string suitable for user output.
>>>
showPeriod (WeekPeriod (fromGregorian 2016 7 25))
"2016/07/25w30"
showPeriodMonthAbbrev :: Period -> String Source #
Like showPeriod, but if it's a month period show just the 3 letter month name abbreviation for the current locale.
periodNext :: Period -> Period Source #
Move a standard period to the following period of same duration. Non-standard periods are unaffected.
periodPrevious :: Period -> Period Source #
Move a standard period to the preceding period of same duration. Non-standard periods are unaffected.
periodNextIn :: DateSpan -> Period -> Period Source #
Move a standard period to the following period of same duration, staying within enclosing dates. Non-standard periods are unaffected.
periodPreviousIn :: DateSpan -> Period -> Period Source #
Move a standard period to the preceding period of same duration, staying within enclosing dates. Non-standard periods are unaffected.
periodMoveTo :: Day -> Period -> Period Source #
Move a standard period stepwise so that it encloses the given date. Non-standard periods are unaffected.
periodGrow :: Period -> Period Source #
Enlarge a standard period to the next larger enclosing standard period, if there is one. Eg, a day becomes the enclosing week. A week becomes whichever month the week's thursday falls into. A year becomes all (unlimited). Non-standard periods (arbitrary dates, or open-ended) are unaffected.
periodShrink :: Day -> Period -> Period Source #
Shrink a period to the next smaller standard period inside it, choosing the subperiod which contains today's date if possible, otherwise the first subperiod. It goes like this: unbounded periods and nonstandard periods (between two arbitrary dates) -> current year -> current quarter if it's in selected year, otherwise first quarter of selected year -> current month if it's in selected quarter, otherwise first month of selected quarter -> current week if it's in selected month, otherwise first week of selected month -> today if it's in selected week, otherwise first day of selected week, unless that's in previous month, in which case first day of month containing selected week. Shrinking a day has no effect.
mondayBefore :: Day -> Day Source #
quarterContainingMonth :: Integral a => a -> a Source #
firstMonthOfQuarter :: Num a => a -> a Source #